Power Allocation To Bihar From Central Sector Expected During 2011-12

Sl. Station FY 2010-11            FY2011-12
(MW) Expected                  (MW)
1 2 3 4
I NTPC  
1 Farakka 393.9 417
2 Kahalgaon 1st ph 253 318
3 Kahalgaon 2nd ph 100.00 100.00
4 Talcher 370.00 372.60
II PTC    
Chukka 80.00 80.00
Tala 260.10 260.10
III NHPC    
Rangit 21.00 21.00
Teesta 108.38 108.38
IV Other Sources    
BSHPC 47.1 47.1
Nepal    
Kanti BUNL 110 110
Sugar Mills 15 55
     
Total 1758.5 1889.18